IMPORTANT
Please read
these
instructions carefully before you start to assemble this greenhouse.
Keep
these
instructions
in
a
safe
place
for future
reference.
»
Customer Service
For
assistance
with
assembly or for replacement parts
-
please log
onto our website
or
call
our
service line
(number
is
on the
title
page).
Additional information
can be
found
at
our website: www.palramapplications.com
Safety Advice
It
is
of utmost importance to
assemble
all
of
the parts according to the directions.
Do
not
skip any step.
We
strongly recommend
using
work
gloves during assembly.
Always wear shoes and safety
goggles when working with extruded aluminium.
If using
a
step ladder or power tools ensure
that you follow the manufacturer's
safety advice.
Do
not touch overhead power cables
with
the aluminium profiles.
Do
not
attempt
to assemble the greenhouse
in
windy or wet conditions.
Dispose
of
all
plastic
bags. Keep
them out of
reach
of
small
children.
Keep
children away from the assembly
area.
Do
not
lean
against or push the greenhouse during construction.
Do
not position your greenhouse
in an area
exposed to excessive wind.
Do
not
attempt
to assemble this greenhouse if you
are
tired,
have
taken drugs or
alcohol or if you
are
prone to dizzy
spells.
Hot items such
as
recently
used
grills,
blowtorches
etc.
must not
be
stored
in
the
greenhouse.
Ensure
there
are no
hidden
pipes or cables
in
the ground before
inserting the
pegs.
This
product
is
designed to
be used
as
a
greenhouse only.
»
Care &
Maintenance
When
your greenhouse
needs
to
be
cleaned,
use
a
mild detergent solution and
rinse
with
cold
clean water.
DO NOT use
acetone, abrasive cleaners or other special detergents to clean the clear
panels.
It
is
recommended to check periodically that roof
panels caps (plastic
part
329 &
profile
981)
are set in place.
»
Tools
&
Equipment
Work gloves
Rubber mallet
Phillips head screwdriver
Adjustable Spanner
/
Wrench
Leveler
Tape measure
Silicone spray
/
Lubricant
Ladder
T001
-
Special
tool for
Screws
411
and nuts 412
G
»
Before
Assembly
Selecting
a
site:
-
The
greenhouse must
be
positioned
and fixed on
a
flat
level surface.
-
Choose
a
sunny position away
from overhanging
trees.
IR
We
strongly recommend
this greenhouse being
secured
directly to
a
solid concrete
foundation.
When
doing that
use
the
pre
drilled
holes
in
the
metal
base.
This
is a
multi-part
assembly best achieved by
two
people.
Allow
at least
a
half
a
day for the assembly
process.
Take all
components
&
parts
out of the
packages.
Sort
the parts and check against the contents
parts
list.
Parts
should
be laid
out
close at hand.
Keep all small parts (screws etc.) in
a
bowl
so
they
do not get
lost.
Please
note multi-sided profiles
are used in
this
greenhouse.
As
a
result some holes
in
the profiles
are
not
used
during
assembly.
Please
review entire instructions before starting.
Carry
out
the assembly
steps in
exact order.
»
Notes
During Assembly
Please
note you install the panels
with
the
UV
protected
side
out (marked
with
"THIS
SIDE
OUT")
and peel the
film strip covering the
panels.
You
may
use
Silicon
lubricant
spray
in
order to help you
slide
the panels into the profiles.
Do
not spray the Polycarbonate
panels.
Use
a
rubber mallet if
necessary.
Steps 23, 28, 36, 42, 46, 48, 49, 58, 62, 66, 71:
Please Note!
Each
of the
3
greenhouses come
with
its
compatible
panels kit
as
shown
in
the
content
list
and
in
the relevant assembly
steps.
;)During assembly
you will encounter the
information
icon, please refer
to the relevant
assembly step
for additional comments and
assistance.
Step
3: Part
8362
is
the greenhouse threshold.
Fixing it
determines the front
side
of
the
greenhouse.
Parts
8254 & 8255 should
be
assembled
as
indicated
in
diagrams
a
&
b.
Step 24:
Part
7180
is
used
for assembly
assistance.
Step 32: Dismantle
Part
7180 and
re-
implemant
in
Step 33.
Step 39: After installing the gutter, it
is
mandatory
to remove
Part
7180 and
discard.
Step 55:
Decide on
the window's location before
assembly.
Windows
can be
installed
at
either one
of
the four
(4)
indicated options.
Step 69:
In
case
the
window
is
not closed
properly, please release
the
screws,
adjust the
profile and
tighten the
screw.
A\
Important
Recommendations
Firmly connect the greenhouse to
a
level
position immediately after completion of
the
assembly.
In
order to anchor the greenhouse
use
the
designated manufacturer anchoring kit.
Anchoring the greenhouse
can also be
done
by
drilling
the
base
profiles
and
fastening it
to the ground
using
ground
screws
or spikes
(screws and spikes are
not supplied).
Tighten
all screws once assembly
is
completed.
Please
note: Anchoring this
product to
the ground
is
essential
to
its
stability
and
rigidity.
It
is
required to complete this stage
in
order
for your warranty to
be
valid.
Screws
411
and nuts
412 are used
throughout the
assembly
process.
Screws
411
are
to
be
assembled from the outside and nuts
412
from the inside of the greenhouse.
If
not specified otherwise, do not fasten
screws and nuts
(411 &
412)
more than
2-3
turns only.
Do
not
tighten them until completion of
the panels' assembly.
These
2
icons
indicate if
screws'
tig htening
is
required or not.
However,
in
some steps,
temporary tightening of
a
few
screws may be
needed to prevent
a
profile from falling.