PYD Electrobombas V1300F Serie Manuel D'instructions Et D'entretien page 14

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTRUCTION MANUAL AND MAINTENANCE
SERIE V/VF
INSTALLATION AND REMARK
1. Before intallation, must carefully check whether there are some parts damaged during transport
and shock. For example whether the cable and plug are in good condition, and the insulated resis-
tance is above 0,5 M Ω. otherwise must check the fault.
2. Check whether the power supply is conformed to the stipulation of nameplate before installa-
tion. Pump must connect with earth to keep safe.
3. Before installation, must check whether the cable and plug is fracted, scratched, broken, etc. If
they are faulty, must consult dealer or technician qualified to replace them.
4. Using iron thos hoop to make the outlet and discharge pipe tight, and then tie a rope on the
handle as sling so as to move the pump up and down.
5. Impacting and pressing the cable is absolutely prohibited. Cable cannot he used for sling.
Don't discretionarily drag the cable while the pump is running, to avoid creepage.
6.The power supply connected with the pump must be assembled with Electricity-leaking circuit
breaker, and the voltage must he controlled within ±15% of the rated to avoid destroying the motor.
7. Don't touch and move the pump before cut off the power to keep safe.
8. Be sure that the connection part between plug and cable is far from the water.
9. Be sure that the plug and cable are far from the heat, oil and the sharp
MAINTENANCE
1. Often check cable and duly replace the cable if it is found with fault of tracted, broken, etc.
2. After running 2000hrs, please maintenance the pump as per the following steps:
Disassemble pump: carefully check the spare parts easily worn, for example bearing, mecha-
nical seal, oil seal, "O" ring, impeller, etc. And duly replace the spare parts damaged..
Chang oil: take the charge plug of oil chamber out, and inject 10# oil to 70-80% of the capa-
city of chamber (edible carthnut oil is avaible if no 10# oil).
Air testing: After maintenance, the pump must be tested by air. Inject high-pressure air into
the pump and keep the pressure at 0.2 Mpa, 0,2Mpa, it proved to be reliable if no leakage wi-
thin 5 minutes.
3. Don't submerge the pump into the water if it started for a long time. Must take the pump out of
the water and clean it and then make anti-rust processing.
If at any time in the future you should need to dispose of this product or any part of
this product, please note that waste electrical products, batteries or cables should
not be disposed of with household waste. Please recycle where facilities exist,
please check with your local authority for recycling advice.
The abandonment or uncontrolled disposal of waste can cause harm to environ-
ment and human health. So, by recycling this product in a responsible manner, you
contribute to the preservation of natural resources and to the protection of human
health.
www.proindecsa.com / proindecsa@proindecsa.com
14

Publicité

Table des Matières
loading

Table des Matières