Emptying The Water Tank; Commissioning And Preparing The Sterilisation - TECHNO-GAZ Hydra Electronic Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

9. EMPTYING THE WATER TANK

WARNING: Turn off the main switch
1. Connect the supplied pipe to the discharge tap (12A) (see dwrg. E).
2. Unscrew the ring nut in counterclockwise direction.
3. Wait that all the tank is emptied.
4. Rescrew the ring nut in clockwise direction.
5.
In case of sterilisation failure, water in the tank could contain contaminated rests; used protective lattice
gloves to carry out this operation.
10. COMMISSIONING AND PREPARING FOR STERILIZATION
(The positions of buttons, displays and LEDs in this paragraph refer to the pictures of page 3)
1. Each day, check the water level in the tank (drwg. D, page 16).
2. Press the Main switch.
3. Open the door using the suitable handle, press and manteining position the push-button WATER
CHARGE; the water enters in the chamber up to reaches the metallic pin in the lower edge of the
chamber front part (see PHOTO A).
Release the push-button WATER CHARGE to water-lock. It is important during this operation, checked
by operator when the water level is right for avoid any leak. Before beginning the sterilisation, it is very
important to check that inside the chamber there is water to avoid a chamber overheating.
4. Load the instruments, placing them on the supplied trays. It is essential not to stack the instruments and
not to overload the tray. The maximum capacity amounts to 1kg for Tray.
OUTLET TAP
dwrg
PHOTO A
. E
17

Publicité

Table des Matières
loading

Table des Matières