2
GUIDE BAR AND SAW CHAIN INSTALLATION
4.
Remove two (2) 6 mm guide bar nuts (C) and remove sprocket
cover (D).
5.
Turn saw chain tension adjuster slot (E) counterclockwise until it
stops.
6.
Install chain on guide bar, with cutters on top of bar facing toward
bar tip.
7.
Install guide bar and chain on gear case, engaging chain with
drive sprocket.
8.
Turn tension adjustment slot clockwise to take up slack in saw
chain.
9.
Install sprocket guard, and tighten guide bar nuts (C) finger tight.
10.
Adjust chain tension. See Saw Chain Tension Adjustment
Instructions on Page 5 of this manual.
11.
Loosen the four (4) screws (A) and remove locator screw (B) from
cutting attachment.
12.
(PPSR-2122/2433 Only) Insert collar (G) into cutting attachment
(long end of collar first) until locator holes (B) are aligned.
P
OWER
I
I
NSTALLATION
NSTRUCTIONS
D
E
C
A
B
G
TM
P
RUNER
C
B