Aerus Air Scrubber Mode D'emploi page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ALTERNATIVE CUTTING METHOD
a. Using template, mark 4 Cutting Method
holes on duct.
METAL DUCTWORK INSTALLATION
5. Remove backing from
mounting plate adhesive gasket.
7. Secure the mounting plate using (8) #8 self-
tapping screws.
9. Secure the unit to the mounting
plate with (4) thumb nuts.
NOTE: Unit requires continuous
power. Do not install where
power to the unit will be
cycled on and off.
c. Cut between holes using tin snips.
1/4
10. Power Connection Requirements:
This device is designed for operation from a 24 VAC transformer
typically supplied with straight cool or HVAC systems and can accept
a voltage input range of 22V-32VAC. As these transformers also
power other circuits, the load capacity of the transformer must be
verified prior to installation to accommodate the maximum combined
load requirements of both the device (18 VA) and all other circuits
powered from the transformer. The minimum voltage output from
the transformer under maximum load from all circuits including the
device should also meet the minimum voltage input requirements of
each circuit's operational specification including the device. If these
conditions cannot be met, installation of a separate 24 VAC transformer
is recommended. Do not connect this unit to any voltage source above
32 volts. Doing so will cause damage to the unit.
b. Drill 4 holes where marked.
(CONTINUED)
6. Center openings and press mounting plate onto duct.
The adhesive gasket will hold the mounting plate in
place.
8. Insert unit into opening. Be sure the air will pass
though the ActivePure® Cell honeycomb matrix.
5