Installation Requirements; Metal Ductwork Installation - Aerus Air Scrubber Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION REQUIREMENTS

WARNING:
1.
Unit should be installed after the air handler in the
HVAC system.
2. The ductwork around the installation area should be clean and
dry to ensure proper adhesion of the gasket materials and any
tape used.
3. When installing near a furnace or heating coils, run the heating
system through five (5) full heating cycles to ensure the
temperature of the Air Scrubber by Aerus unit does not exceed 200˚F.
4. An approximate 3.5" (8.89 cm) opening will need to be cut into the existing
ductwork to install the unit properly.
Power Connection Requirements:
This device is designed for operation from a 24 VAC transformer typically supplied with straight cool or
HVAC systems and can accept a voltage input range of 22V-32VAC. As these transformers also power
other circuits, the load capacity of the transformer must be verified prior to installation to accommodate
the maximum combined load requirements of both the device (18 VA) and all other circuits powered
from the transformer. The minimum voltage output from the transformer under maximum load from all
circuits including the device should also meet the minimum voltage input requirements of each circuit's
operational specification including the device. If these conditions cannot be met, installation of a separate
24 VAC transformer is recommended. Do not connect this unit to any voltage source above 32 volts. Doing
so will cause damage to the unit.
NOTE: Unit requires continuous power. Do not install where power to the unit will be cycled on and off.

METAL DUCTWORK INSTALLATION

1. Locate suitable area
of duct for installation.
3. Mark location for 3.5" opening using either the
mounting plate or included template.
4
This unit must be installed by a licensed
HVAC contractor. Failure to do so will void
warranty of the product.
Min. 9" x 9"
Metal Ductwork
Min. 10" x 10"
Fiberglass
Ductwork
Handler
2. Cut away insulation to expose metal duct
(if needed).
4. Cut hole in duct using 3.5" hole saw.
Max. 15 ft.
Air

Publicité

Chapitres

Table des Matières
loading

Table des Matières