Install The Blower Tube; Install The Battery Pack; Remove The Battery Pack; Operation - GreenWorks Pro BL60L01 Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

10.2

INSTALL THE BLOWER TUBE

1. Move the tube until the tube release button engages into
the slot.
2. Connect the nozzle to the tube until the the tube locks
into the nozzle.
You can use the nozzle to increase airflow in tight areas.
10.3

INSTALL THE BATTERY PACK

WARNING
If the battery pack or charger is damaged, replace the
battery pack or the charger.
Stop the machine and wait until the motor stops before
you install or remove the battery pack.
Read and understand the instructions in the battery and
charger manual.
1. Align ridges on the sides of the battery pack with the
grooves in the battery compartment.
English
TIP
2. Push the battery pack into the battery compartment until
the battery pack locks into place.
3. When you hear a click, the battery pack is installed.
10.4

REMOVE THE BATTERY PACK

1. Push and hold the battery release button.
2. Remove the battery pack from the machine.
11

OPERATION

WARNING
Make sure the blower tube is in position before operation.
11.1

START THE MACHINE

1. Pull the trigger (1) to start the machine.
2. Pull the trigger fully to increase the speed.
3. Release the trigger to decrease the speed.
11.2

STOP THE MACHINE

1. Release the trigger to stop the machine.
7
EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bl60l251

Table des Matières