Install the cable glands and proceed with the
wiring.
9
•
Close the casing by pressing on the upper
section until it clicks into place.
1.1
Wiring instructions
The following instructions apply only to connections to be carried out by an installer. The electrical panel is
pre-wired in the factory. The panel wring should not be altered under any circumstances to avoid any risk
of damage or accidents.
The cable cross section must be correctly sized for the current carried (especially in the case of underwater
lights).
Check that connections are correctly tightened.
An inadequately sized cable or badly tightened connection could start a fire.
CONSTRUCTION & RÉNOVATION
8
•
Replace the casing, attaching the bottom
section first.
10
•
Insert the two screws back to the bottom part
of the control panel.