ShelterLogic Shed-in-a-Box Mode D'emploi page 8

Masquer les pouces Voir aussi pour Shed-in-a-Box:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7. Door pAnel AnD BAcK pAnel instAllAtion
A. (1) Hold end panel at the top center with white inner surface facing inside of the shelter. (2) Wrap the edges
of the fabric panel around the end rib and line up the cross rails with the pre made slits in the fabric.
A1
B. (1) Disconnect top cross rail (the horizontal pipe that runs from front to back along the top) from the end rib.
(2) Pull the end panel over the end rib and bring the end of the cross rail through the cut slit in the panel.
(3) Reattach the top cross rail to the end rib.
B1
C. (1) Disconnect side cross rail from the end rib. Leave the ShelterLock
(2) Pull the end panel over the end rib and bring the end of the cross rail through the cut slit in the panel.
(3) Reattach the side cross rail to the end rib.
c1
B2
c2
Page 8
A2
B3
3X attached to the rib with the bolt.
®
c3
05_70443_70743_F3

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

7044370743

Table des Matières