Start
Step 1:
Instrument Setup
Time & Date setup
Recharge batteries
Clear memory
Step 2:
Measurement Setup
Step 2.1:
Sync. & wiring
Conn.Type(4W,3W,1W)
Sync channel:U1 | I1 | U12
Freqency: 50 Hz | 60 Hz
Step 2.2:
Voltage range & ratio
Nominal voltage
Transf. voltage ratio
Step 2.3:
Clamps setup
Clamp type
Clamp range
Step 2.4:
Event Setup
Nominal voltage
Thresholds
Step 2.5:
Alarm Setup
Define alarm and
its parameters
Step 2.6:
Signalling Setup
Sig. Freq. 1
Sig. Freq. 2
Step 4:
On Line Measurement
Preform measuremement
Save waveform snapshoots
Step 5:
Recorder setup
Select recording start
time and interval
Include alarms and
events into recorder
Start waveform recorder
Image 4.1: Procédure de mesure recommandée
Prepare instrument for new measurement,
before going to measuring site. Check:
Is it time and date correct?
Are batteries in good condition?
Is it Memory List empty? If it is not,
download all data from previous
measurements and release storage for
new measurement.
Step 3:
Inspection
Phase diagram
U,I,f meter screen
Power meter screen
Double check Measurement setup
using Phase diagram, and various
scope and metering screens
Using power metering check if
power is flowing in right direction
(power should be positive for load
and negative for generator
measurements)
Recording in progress
Measurement conclusion
Report generation (PowerView v3.0)
Download data
Analyse data
Create report
Export to Excel or Word
101
Setup Power Master according
to the measurement point
nominal voltage, currents, load
type. Optionally enable events or
alarms and define parameter
thresholds.
Step 6:
Stop recorder
Power off instrument
Remove wiring
Analyze recorderd data with
instrument (Memory List,
Event and Alarm tables)
Step 7: