Installation - Samsung POWERbot SR2AH905 Série Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

installation

the docking station must be plugged in and turned on at all times.
D C - I N
1
Connect the
adapter jack
to the docking
station
Power lamp (Red)
D C -I N
2
Connect the
power cord to
the adapter
When using the adapter,
the side with the sticker
attached must face down.
ENGLISH-08
Install the docking station in a place
without obstacles and danger of
falling.
3
Connect the
power plug to
the outlet
The power indicator lamp
(Red) will turn on.

Publicité

Table des Matières
loading

Table des Matières