Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

EN
18

INSTALLATION

Step 1:
Put the hanging scaffold
at the position you want
to install, and draw
the holes. After drilling
holes, put the 8pcs of
wall-plug into the wall
and fix it.
Step 2:
Take out the hanging
scaffold, and use the
washer and screws to
fit the hanging scaffold
on the ceiling and
make sure the hanging
scaffold fastened.
Step 3:
In the middle of hanging
scaffold, socket space is
reserved.
Hole: Ø 8-10 mm
Depth: 65 mm
Hole
Reservation place for power
Wall Plug
Ø 10 mm
Washer
Ø 6 mm
Screw
ST6*60

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

100325791003421310034214

Table des Matières