• Close the fuel cell door.
Load and unload the fastener
•
Insert battery and fuel cell before you load the fas-
teners. If you load the fastener before the battery
and/or fuel cell is connected, the fastener may be
shoot out accidentally.
•
Point the nozzle away from any personnel and
keep your finger away from the trigger when load-
ing the fastener.
For magazine without stopper
•
To load the fastener, slide in the fastener strip into
the magazine
•
Push the release lever and pull the pusher until it
is behind the fastener strip.
• Gently release the pusher to engage the fastener
strip
• To unload the fastener from the magazine, press
the release lever on the pusher and tilt the gas
tool to slide the fastener strip to the rear end of the
magazine.
•
Unload the fastener strip by sliding out the fastener
strip.
For 3 steps magazine design, follow the same
safety precaution and continue with following
steps
• To load fasteners, pull the pusher to the rear until it
is locked to the magazine at rear position.
• Slide fastener strip into the magazine.
• Gently release the pusher to engage the fastener
strip
• To unload the fastener from the gas tool, pull
the pusher to the rear locking position. Slide the
fastener out of the magazine.
Depth of drive adjustment
• The gas tool is equipped with a depth of drive
adjustment. Test the depth of drive on scrap piece
before you start your work.
• Turn the knob to adjust the depth of drive.
• Repeat above procedure until you find your de-
sired depth of drive setting.
Specific for concrete nailer; push the slider
sidewards to adjust the depth.
Actuating the gas tool
• The gas tool is equipped with a full sequential
actuation system only.
• To actuate the gas tool, depress the safety against
the workpiece, and then pull the trigger.
• To actuate the gas tool again, you will need to re-
lease the safety fully and release the trigger before
you repeat above procedure.
• Make sure you are driving against workpiece
before you pull the trigger.
Operating the gas tool
• To ensure proper operation and avoiding overheat-
ing or choking of the gas tool, driving pace should
not exceed 1,000 shots/h and 4,000 shots/day at
optimal working conditions. High temperatures
and/or high altitudes will decrease the feasible
mamimum number of shots per day.
Jam clearing for framing nailers and
staplers
• In the case of fastener jam, disconnect the fuel cell
and battery before you perform any actions.
• Release pusher to avoid pressure on the fastener
strip.
• Use a suitable tool eg. a #2 Phillips screw driver to
insert into the drive channel.
English
65