Check List For Operation - Blomberg BOTR30102SS Manuel D'installation

Masquer les pouces Voir aussi pour BOTR30102SS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

11

CHECK LIST FOR OPERATION

1. Make sure the unit has been installed according to all of the installation instructions, the top cabinet
template and wall template.
2. Remove all packing material from the oven.
3. Plug in the power cord.
4. Read the User Manual.
5. Keep this Installation Manual for the local electrical inspector's use.
Over The Range Microwave Oven / Installation Manual
15 / 29 EN

Publicité

Chapitres

Table des Matières
loading

Table des Matières