7. Test run
Fig. 7-8
45
7
Fig. 7-9
A
B
C
Fig. 7-10
8
6
23
A Water supply pump
B
C Drain plug
D Pour water through outlet
Be careful not to spray water into
the drain pump mechanism.
D
1
Turn on the power to the unit at least 12 hours before the test run.
2
Press the
button for 5 seconds. (Fig. 7-8)
(Perform this operation when the remote controller display is turned off.)
3
Press the
button.
A
[TEST] and the current operation mode are displayed. (Fig. 7-9)
4
Press the
button to activate cool mode, then check whether cool air is
blown out from the unit.
5
Press the
button to activate heat mode, then check whether warm air is
blown out from the unit.
6
Press the
button and check whether the fan speed changes.
7
Press the
button and check whether the auto vane operates properly.
8
Press the
button to stop the test run.
(After two hours, a signal will be sent to stop the test run.)
Note:
3
8
steps
to
.
7.4. Check of drainage (Fig. 7-10)
from joints.
When electric work is completed.
When electric work is not completed.
turned on to L and N on terminal block after the connecter (SWE) on controller
board in the electrical branch box is set to ON.
Be sure to turn it back to the former state after work.
21