Finishing The Installation; Using Your Ceiling Fan - Fanaway Evora Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 24
Fanaway Evora Installation Instructions
After completing the electrical connection at the mounting bracket terminal block, connect the ceiling
fan wiring via the quick connector plug.
Cover the mounting bracket with the canopy. Ensure all electrical wiring is tucked inside the canopy
and that the wires are not damaged during this step. Secure the canopy to the hanger bracket using
the screws provided. Fig. 8
REMOTE CONTROL
Your ceiling fan is controlled by the remote control. Before
operating the remote, the following must be considered.
-
1 x CR2032 3V battery is required to operate the remote
control. Pull out the battery tray (2) by pressing the click
(1) of the battery tray. Place the battery (3) on the tray
and insert the tray back to remote hand set (4) indicated
by "+" polarity symbol (5). Ensure the polarity is correct
as shown in the battery compartment.
10 | P a g e

FINISHING THE INSTALLATION

USING YOUR CEILING FAN

Fig. 9
Fig. 8

Publicité

Table des Matières
loading

Table des Matières