6.2
ash drawer kit (EP20LAD)
WARNING
!
•
Failure to achieve a good seal between the ash opening and ash plug will result in an over-fire condition that
could cause damage to the appliance.
Provisions have been made on the appliance to install an optional ash drawer kit. The kit allows for
•
If the appliance has been previously operated, the appliance must
be cold and the ashes must be removed in order to access the
ash plug.
note:
Place the ash drawer from the kit underneath the appliance
to catch falling ashes during the installation.
•
From the underside of the appliance, remove the nuts that
secures the heat shield and the ash opening cover plate.
•
Remove the small light weight brick that is covering the ash
opening, and discard. It is important that the area around the ash
opening be cleaned well to ensure that a proper seal is created
between the new ash plug and the ash opening.
•
Once the area surrounding the opening has been cleaned, place
the new ash plug (supplied) over the opening.
•
Carefully remove the knock out from the heat shield by breaking
the micro tabs.
•
Bend out the four bend tabs at a 90 ° angle from the heat shield.
•
Align the slots in the ash drawer housing with the four bend tabs.
Secure using the four screws supplied.
•
Secure the heat shield and ash drawer housing to the appliance using the nuts removed in step 2.
•
Slide the ash drawer into the ash housing.
convenient removal of excess ash.
HEAT SHIELD
MICRO TABS
optional installation
W415-1463 / E / 08.20.18
EN
25