Set-Up; Checking Connections Shunt To Converter; Battery Capacity - Vetus BATMON Instructions D'installation Et Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 28

3 Set-up

The instrument must first be set-up be-
fore it can be used.
Once it has been set correctly this only
has to be done again when the battery
or the shunt is replaced.
On the separate sheet 'Operation and
Setup' all the actions to be performed
are shown.
• Switch on the power, battery main
switch and key switch.
When the power is switched on the
pointer on the instrument will indicate
the charge condition and on the display
the charge or discharge current will be
displayed.
14
090433.01
n
!
Ote
3.1 Checking connections shunt
to converter
A charging current is shown as positive
(no sign before the value of the current).
A discharging current is shown as neg-
ative (a "–" sign before the value of the
current).
If the polarity of the current is not dis-
played correctly, then exchange the
wires at the converter (3 and 4) which
are connected to the shunt.
Use the push button switches to display
other information and to carry out the
set-up. See 'Operation and Setup' on
the separate sheet.

3.2 Battery capacity

• Go to
  Battery  Monitor  Setup 
'2 Operation'.
• Press both push buttons simultane-
ously for at least 3 seconds to se-
lect
  Battery  Monitor  Setup 
'3 Entering battery capacity'.
  Battery 
is now selected.
see
, see
Battery Monitor

Publicité

Table des Matières
loading

Table des Matières