Potentially Explosive Atmosphere; Hot Surface; Installation And Connection; Installation Site Requirements - Bühler technologies RC 1.1 Notice De Montage

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26
RC 1.1, RC 1.2+
DANGER

Potentially explosive atmosphere

Explosion hazard if used in hazardous areas.
The device is not suitable for operation in hazardous areas
with potentially explosive atmospheres.
Do not expose the device to combustible or explosive gas mix-
tures.
CAUTION

Hot surface

Risk of burns
The housing can be up to 60 °C during operation.
Allow the unit to cool down before working on it.
3 Transport and storage
Only transport the product inside the original packaging or a
suitable alternative.
The equipment must be protected from moisture and heat
when not in use. It must be stored in a covered, dry and dust-
free room at a temperature of -20 °C to 60 °C (-4 °F to 140 °F).

4 Installation and connection

4.1 Installation site requirements

The unit is intended for wall-mounted or table-top use in en-
closed areas. Adequate protection from the weather must be
provided when used outdoors.
Install the unit leaving enough room below the cooler to dis-
charge the condensate. Leave room above for the gas supply.
Be sure to maintain the approved ambient temperature. Do
not obstruct the convection of the cooler. The vents must have
enough room to the next obstacle. The distance must espe-
cially be a minimum of 10 cm on the air outlet side.
Ensure adequate ventilation when installing in enclosed
housings, e.g. analyser cabinets. If the convection is inad-
equate, we recommend aerating the cabinet or installing a
fan to lower the inside temperature.
4.2 Installation
Run the gas supply to the cooler with a downward slope. The
gas inputs are marked in red and additionally labelled "IN".
If a large amount of condensate accumulates, we recommend
using a condensate trap with automatic condensate drain.
Our condensate drains, 11 LD spec., AK 20 V, or model 165 SS,
are suitable.
Glass vessels and automatic condensate drains are available
for draining condensate for external mounting below the
unit. When using automatic condensate drains, the sample
gas pump must be installed upstream of the cooler (pressure
operation) to ensure proper function of the condensate drain.
If the sample gas pump is located at the cooler outlet (suction
operation), we recommend using glass condensate traps or
peristaltic pumps.
12
Bühler Technologies GmbH
Connecting the condensate drains
Depending on the material, build a connecting line with fit-
tings and tubing or hose between the heat exchanger and
condensate drain. For stainless steel the condensate drain can
be suspended directly to the connecting tube, for hoses the
condensate drain must be secured separately using a clamp.
The condensate drain can be mounted directly to the heat ex-
changer.
Condensate lines must always be installed with a slope and a
minimum inside diameter of DN 8/10 (5/16").
The DTV heat exchanger cannot be operated in conjunction
with an automatic condensate drain.
4.2.1 Connecting the filter gas connections (optional)
The connection between the heat exchanger outlet and the fil-
ter inlet already has tubing. The connection G1/4 or NPT
1/4" (filter head marked NPT) for the gas outlet must be care-
fully and properly connected using a suitable screw connec-
tion.
When ordering the cooler with the option filter without Mois-
ture detector, a bypass may be connected to the filter head.
The filter head is intended for a G1/4 internal screw thread
which is plugged at the factory. To use it, unscrew the plug
and screw in a suitable screw connection. Pay attention to
leaks.
NOTICE
Installing filters limits the maximum approved operating
pressure in the system!
Operating pressure ≤ 2 bar
4.2.2 Flow adapter connection (optional)
When ordering the cooler with the option moisture detector
without filter, it will be factory installed inside a flow adapter.
The connection between the heat exchanger outlet and the
flow adapter inlet does not have tubing included. The connec-
tion G1/4 or NPT 1/4" (flow adapter marked NPT) for the gas
inlet/outlet must be carefully and properly connected using a
suitable screw connection. Here the direction of flow is not
relevant.
4.2.3 Connecting the moisture detector (option)
When ordering the cooler with moisture detector option, it
will be factory installed inside a flow adapter, or for the filter
option installed and connected in the filter head.
4.2.4 Peristaltic pump connector (optional)
Coolers ordered with built-in peristaltic pumps already have
these installed and wired. Heat exchangers ordered at the
same time are already installed and connected to the peri-
staltic pumps.
NOTICE
Installing peristaltic pumps CPsingle / CPdouble limits the
maximum permissible operating pressure in the system!
Operating pressure ≤ 1 bar
BX450028 ◦ 09/2021

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rc 1.2+

Table des Matières