Kampa Travel Pod Action AIR Guide De L'utilisateur page 5

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32
Setting Up
Once all the AirPoles have sprung
5
outwards assuming their correct
shape, detach the pump from the
awning and tighten the outer valve
cap on each inflation point. It is
important that each cap is refitted to
prevent the seepage of air.
Action/Motion only: Inflate the lateral
AirPole to between 7-8 psi (0.48-0.55
bar) and place between the AirPoles
inside the awning (5).
6
Close all doors and entrances and
check the positioning of the corner
pegs again. If necessary, re-peg to
ensure that the awning is taught.
Peg all the intermediate pegging
points ensuring that each side is
straight (6).
7
Action/Motion only: Thread the
canopy pole through the canopy pole
sleeve (7) and connect to the 'cups'
located on the AirPole at each end of
the pole sleeve.
If you are using the groundsheet,
8
toggle it into the base of the awning
using the 'O' rings (8).
5
TP-AIR-UM-09-17-Rev.B

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Travel pod motion airTravel pod cross airTravel pod trip air

Table des Matières