AQUA SALT
Salt chlorine generator
Cut the pipe where
the electrolytic cell
must be placed,
according to the
dimensions shown in
the picture above
Control box has to be fastened to the wall. Screws and bracket for a proper wall fastening are
3.1.2
included in the supply.
Control, box
Installation
At this point, it is necessary to connect the electrolytic cell to the control box by connecting flow
3.1.3
sensor, temperature probe and the part that provides voltage to the plates, as indicated in the
Electrolytic Cell and
image sequence below:
control box
installation
1 cell supply voltage
2 temperature sensor
ADSP7000648
1.
2.
Insert the white ring
nuts
labelled
number 1, and stick
the reducers indicated
with number 2 at the
two extremities of the
pipe. Wait as much as
indicated on the glue
packaging
moving
to
following step.
1
Fastening kit
1.
rev. 1.4
MAINTENANCE AND INSTRUCTION MANUAL
3.
Place the electrolytic
cell in the direction
with
indicated
by
arrows,
i.e.
direction water flows
through the system.
before
the
2
Place the bracket in the
direction shown by the
picture using the screw
included.
2.
Connect the temperature
probe and fix the tray to the
electrolytic cell using the
screws included.
31/07/2017
ENGLISH
4.
Screw the white ring
nuts to fix the cell to
the pipes. At the end
the
of
this
phase,
the
the
electrolytic cell must
look like the picture.
3
Insert the control box,
making it slide on the
bracket from the top to the
bottom up to the end limit.
3.
Insert the white rubber cap
to cover the connection
wires..
65/264
65