Safety Cage /
Cage de sécurité
A safety cage may be required on low terminations. Please check with your local safety authority.
Une cage de sécurité peut être nécessaire de faibles terminaisons. S'il vous plaît vérifiez auprès de
votre autorité de sécurité locale.
Vertical Installations
Always maintain a 1" clearance around the vent pipe (vertical) and 1" clearance horizontal, when passing
through ceilings, walls, roofs, enclosures, attic rafter or any combustible surfaces.
When passing through a flat ceiling install a Box/Wall thimble. Cut a 9" square hole and frame as shown in
the diagram below.
ALWAYS CHECK YOUR LOCAL CODES BEFORE INSTALLING VENTING. CLEARANCES ETC,
TOUJOURS vérifier les codes locaux avant l'installation VENTILATION. ETC DÉGAGEMENTS, peut
The diagram below shows the
minimum clearances as per the
chart on following page.
3.00
12.00
DO NOT PACK AIR SPACES WITH INSULATION
NE PAS PACK ESPACES D'AIR AVEC ISOLATION
9" x 9" opening
MAY VARY FROM STATE TO STATE (PROVINCE TO PROVINCE).
varier d'ÉTAT (PROVINCE).
Consult local codes for minimum vent cap height above the roof,
vent must be a minimum of 2' from any wall.
To prevent water seepage; install the flashing with upper portion
under the roofing material and lower portion over the roofing
material. Note: Do not fasten down until the final adjustments to
the vent have been made.
Termination above Roof
Page 21 of 44