Section 3. Installation Instructions; Materials And Tools; Installation Requirements - Jandy Pro Series TruClear Guide D'installation Et Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Page 8
ENGLISH

Section 3. Installation Instructions

FOR YOUR SAFETY: This product must be installed and serviced by a professional pool/spa service technician
as described on the front cover of this manual. The procedures in this manual must be followed exactly. Failure to
follow warning notices and instructions may result in property damage, serious injury, or death. Improper installation
and/or operation will void the warranty.
EQUIPMENT UNDER PRESSURE: Always turn pump off prior to installing or servicing the Jandy Pro Series
chlorine generating device. Your pump/filter system is operated under pressure and the pressure must be released
before you begin work. Please see your pump/filter owner's manual for further instructions.
Disconnect power to the system at the main circuit breaker before performing this procedure to avoid risk of
electric shock which can result in property damage, severe injury or death.
Before you begin your installation, please check that you have the right tools and a suitable location to install the
power pack and cell. Please ensure that you have read and understood the Important Safety Instructions section.
3.1

Materials and Tools

Tools and Materials Needed for Installation
• Screw Set (Plastic Anchors)
• Cordless Drill (or Power Drill)
• 6 mm (15/64 in.) Masonry Bit or Hammer Drill Bit (only necessary to drill into brick or concrete)
• Pencil or Marking Pen
• Phillips Head Screwdriver or Phillips Head Drill Bit
• WELD-ON
724™ CPVC Gray Cement is recommended
®
3.2

Installation Requirements

WARNING
The Jandy Pro Series chlorine generating device
must be installed horizontally with the cord facing
upwards to avoid buildup of flammable gases which
can result in FIRE OR EXPLOSION.
The installation requirements for the Jandy Pro Series
chlorine generating device are as follows:
The power pack must be installed at least 1.5 m (5 ft.)
vertically off the ground.
In the U.S., the power pack must be installed at least
1.5 m (5 ft.) from the inside wall of your swimming
pool or spa; in Canada, the power pack must be
installed at least 3 m (10 ft.) from the inside wall of
your swimming pool or spa.
The cell must be installed on a 0.4 m (16 in.)
horizontal length of pipe after the heaters, pumps,
and filters, as the last piece of equipment in the
circulation plumbing system.
(see Figure 3).
The cell must be installed no more than 4.6 m (15
ft.) from the power pack (see Figure 3).
It is recommended that the cell be installed 25 cm
Jandy
Pro Series TruClear
Chlorine Generating System
®
WARNING
WARNING
(10 in.) from any 90° elbow.
Figure 3.
|
Installation & Operation Manual
Installation Requirements

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Truclear11k0 52337 06920 528-135528-1354Truclear11ku

Table des Matières