Page 12
ENGLISH
2.
Remove the electrical mounting plate that feeds the
power cable to the power pack.
3.
Feed the power cable through the mounting plate.
4.
Connect the conduit to the mounting plate.
5.
Make the wire connections. Note: The green wire
should be connected to the ground point.
WARNING
Select field conductor size appropriately, taking into
consideration length of circuit and in accordance with
applicable installation codes. The ground conductor
must be minimum 12 AWG
CIRCUIT BREAKER
PANEL
240 VAC
LINE 1
LINE 2
GROUND
Pool Pump
Figure 4.
Wiring Diagram
Jandy
Pro Series TruClear
®
Use Copper Conductors Only – Rated for 90°C Minimum
12
POOL PUMP CONTROL
9
3
6
TO EARTH
BONDING POINT
Chlorine Generating System
™
6.
Place all of the wire connections and cables inside
the power pack and secure the electrical mounting
plate tightly.
7.
Plug the cell into the Power Pack.
3.6
Bonding
The National Electric Code
equipment to be bonded to each other. Check your
local codes to determine if the NEC and/or other local
installation codes are enforced by the Authority Having
Jurisdiction (AHJ). A solid, copper 8.37 mm
wire is recommended, per the NEC, for bonding the
power pack to a permanent bonding connection that
is acceptable to the local AHJ. Refer to your locally
enforced codes for the acceptable bonding wire gauge.
Attach the bonding point located on the bottom of the
chassis backplate to a common bonding point. Do not
use the power pack as the common bonding point. Each
piece of non-related pool equipment requiring a ground
should also be bonded to the common, approved bonding
point. There should be one bonding connection to the
power pack. In Canada, the Canadian Electrical Code
(CEC) dictates that the bonding conductor be, minimum
2
13.3 mm
(6 AWG).
POWER PACK
|
Installation & Operation Manual
®
®
(NEC
) requires pool
2
(8 AWG)
TO EARTH
BONDING POINT
TO CELL