ASSEMBLY INSTRUCTIONS
Approximate assembly time is 5-10 minutes
Suggested Tools:
Wrench and/or Ratchet Set
• Remove bottom bolt from each side of
handle (below triangle shaped thumb
screws)
• Loosen thumb screws and flip up handle
• Replace bolts below thumb screws
and tighten down
• Tighten thumb screws completely
* Note: If spring detaches from bail assembly,
simply re-attach (see Figure A).
GENERAL OPERATING INSTRUCTIONS
• Be sure gate control is in the closed position (do not hold bail down when filling)
• Determine appropriate setting for material being used by reading the suggested setting on the material's bag.
Be sure to read the instructions on the bag/box of the material you're spreading to identify accurate setting needed)
• To begin spreading, start walking (about 3 mph pace) and pull the bail system down to open gate
• To stop spreading simply let go of the bail and the gate will close
BAFFLE OPERATING INSTRUCTIONS
• Adjust baffle by hand to block distribution accordingly. Front and sides can be adjusted independently.
• Use wing nuts to adjust tension on baffles.
STORAGE AND MAINTENANCE
• When finished spreading empty hopper of any remaining material
• Thoroughly wash spreader and allow to dry before storing
• To fold down handle:
- Simply remove the bottom two bolts on the handle
- Loosen two thumb screws and fold down handle
- Replace two bottom bolts
- Tighten thumb screws completely
CHAPIN INTERNATIONAL, INC. P.O. BOX 549 700 ELLICOTT ST. BATAVIA, NY 14021-0549 www.chapinmfg.com 800-950-4458
Thumb
Screws
Bolts
Handle
Figure A