The horizontal support must be flush with the room side of
the studs. Use cleats behind both sides of the support to
secure to wall studs.
Reinstall drywall and refinish.
IMPORTANT: Framing must be capable of supporting 100 lbs.
6
⁄
" min. opening for ductwork
1
2
Mounting the hood
Install the 6" round transition as shows the image below.
The installation screws and the 6" round transition are included
on the hood package.
I WARNING
2 PEOPLE ARE REQUIRED TO LIFT AND POSITION THE
HOOD ONTO THE MOUNTING SCREWS.
Place the template on the wall along the horizontal line,
make sure the template is leveled and centered with the
centerline.
Mark "upper" screw holes locations in the wall.
IMPORTANT. Check to be sure that hole locations are leve-
led and correctly centered by the vertical centerline.
Drive "upper" wood screws by hand. Leave ¼ " of distance
between the screw head and the wall.
Remove the grease filter and mount the hood onto the
"upper" screws.
10
View from
rear cleats
1"x6" min.
mounting
support
Centerline of
installation
space
Ø 6"
Mark "lower" wood screw holes
locations in the wall using a
pencil.
Remove the hood.
Drive "lower" wood screws, by
hand. Remove screws.
Mount the hood onto the "upper"
screws.
Drive and tighten the "upper"
wood screws, by hand.
Drive and tighten the "lower"
wood screws, by hand.
Air deflector installation
Assemble the air deflector with the duct cover bracket
with 4 assembly screws provided as shown.
Measure from the bottom of the air deflector to the
bottom of the hood outlet, as shown.
Cut the duct at the measured size.
Uninstall the air deflector removing the 4 assembly screws.
Slip the duct onto the bottom of the deflector.
Place the assembled deflector and duct over the exhaust
outlet from the hood.
Dimension to measure