Installation & Commissioning; Recommended System Layout; Installation Parts - Parker UHPZN2-1000 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3 Installation & Commissioning
Only competent personnel trained, qualified, and approved by Parker should perform commissioning and service procedures.

3.1 Recommended system layout

Basic layout
Cyclical demand
(e.g. glove box, fume cupboard)
Pressure regulator
Isolation Valve
3 Way ball valve

3.1.1 Installation Parts

Description
1/8" OD Tube Ball Valve
1/4" OD Tube Ball Valve
1/8" OD Tube 3 Way Ball Valve
1/8" BSPP (G1/8) Pressure Regulator
(0 - 8.6 barg/ 0 - 125 psig / 0 - 0.86 MPa)
1/8" OD Copper Tube (Grade B-280) (15 m / 50 FT)
1/8" OD Tube 3 Way Ball Valve
1/8" OD Tube Ball Valve
1/8" OD Tube Equal Tee
1/8" OD Tube Pressure Relief Valve
Installation Parts display Parker Master Catalogue part number and may ordered through your local authorised Parker Sales Company.
Please note the gas bottle and/or gas bottle regulator are not supplied by Parker Hannifin.
8
Basic layout with back up supply
Steady and cyclical demand
Flow Controller
Pressure relief valve
Stainless Steel
--
--
--
--
--
--
--
This relief valve should be sized by the installer to suit the installation
Non return valve
Application Instrument
Part Number
Brass
2A-MB2LPFA-BP
4A-MB4LPFA-BP
2A-MB2XPFA-BP
14R013F1
--
2A-MB2XPFA-BP
2A-MB2LPFA-BP
2ET2-B
Copper
--
--
--
X50CT-2-30
--
--
--

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Uhpzn2-3000Uhpzn2-1000cUhpzn2-3000c

Table des Matières