Télécharger Imprimer la page

Beko MAT 13 Instructions De Montage Et De Service page 6

Publicité

Installation • Instalación
Installation • Instalação
2
3
4
1
wrong • no correcto
incorrect • incorrecto
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0
6
5
6
correct • correcto
correct • correcto
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0
1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0
1. Feed pipe and fitting at least ½"!
(internal dia > 0,51 inch)
2. No filters in feed line
3. Slope in feed line > 1%!
4. Only use ball valves!
5. Pressure: min. 12 psig or 18 psig!
(check type plate for correct pres-
sure)
6. Short pressure hose!
7. For each yard of rising slope in the
outlet line, the required minimum
pressure will increase by 1.5 psig.
8
7
The rise of the outlet line must not
exceed 17 feet!
8. Collecting line min. ¾ '' with 1% slope
9. In the case of inflow problems, install
venting line.
Note: Pressure differences!
Each condensate source must be
drained separately!
Note: Venting!
If the feed line cannot be laid with
sufficient slope, it will be necessary to
install a venting line!
Note: Deflector area!
If drainage is to take place directly
from a line, it is advisable to arrange
the piping so that the air flow is diverted.
BEKOMAT 13, 13 CO, 13 CO PN25, 13 CO PN40
english

Publicité

loading

Ce manuel est également adapté pour:

Mat 13 coMat 13 co pn25Mat 13 co pn40