10. Press
adjust the value shown to the
concentration of the prepared
standard, 1.00 in this example.
NOTE: A maximum adjustment of
25% is possible.
11. Press
ENTER
leave the Calibration procedure
without saving the adjustment,
press
EXIT
at any time to return to the
ENTER
default value. The calibration has
now been standardized and can
be used for testing. Scroll to Scan
Blank and begin testing.
SET UP
SETTING THE CLOCK
Setting the clock allows the correct time and date stamp to be stored with each
reading in the data logger.
1.
From the Editing Menu, press
or
Clock.
2.
Press
ENTER
The year is displayed. Press
or
appropriate character. Press
to select the character. The
ENTER
month, day, hour, format hour,
minute, second, AM/PM will be
dislpayed. Repeat for each.
3.
Press
ENTER
character. The time and date will
be saved and the meter will return
to the Editing Menu.
or
to
to save the value. To
.Press
and
to scroll to Set
to select Set Clock.
to scroll to the
to select the fi nal
025 Chlorine T DPD
1.00
ppm
, =Edit, ENTER=Save
+ENTER=Default
12:00:00
025 Chlorine T DPD
1.00
ppm
%T/Abs
Calibrate
12:00:00
Editing Menu
Set Clock
Logging
Factory Setup
Set Power Save
12:00:00
Set Time
Year: 2000
12:00:00
Editing Menu
Set Clock
Logging
Factory Setup
Set Power Save
12:00:00
11
001/500
001/500
001/500
001/500
001/500