Installation & Loading Instructions - MPG113MD SS Combo
26
Safety tie-downs are required for all transport. If your kit did not include
If your kit did not include safety tie-downs, we strongly recommend the use of the
Malone MPG316 Sentry Ratchet Tie-Down System or Malone MPG309 SpeedLine Mini Ratchet Tie-Down
For added stability for larger kayaks, dress the straps down under the cross
bars before bringing them back up through the slots in steps 17 and 25.
Always check mounting hardware, load straps and safety tie-down lines for proper
and secure attachment before transport. Use of this product for any other
Warning: All vehicular rooftop transports are potentially hazardous.
Any person using MALONE automotive transport systems is personally
responsible for following the given directions for use and installation
and accepts full and complete responsibility for any and all damages
or injury of any kind including death, which may result from their use.
MALONE
IMPORTANT NOTES:
Bow and Stern Safety tie-downs are required for all transport.
Failure to use these safety lines voids all warranty.
safety tie-downs, we strongly recommend the use of the Malone
MPG316 Sentry Ratchet Tie-Down System.
application other than kayak transport voids warranty.
MALONE AUTO RACKS, 81 County Road, Westbrook, Maine 04092
Phone: 207-774-9100 Fax: 207-615-0551
Website: www.maloneautoracks.com Email: technical@maloneautoracks.com
. Thread the free strap ends up and through
the buckles. Pull down to tighten. Dress
any extra strap down and around the cross
bars. See image 26.
. For MD series only: Install the bow & stern
safety lines per the attached instructions.
R
TM