S19-788H
Read this installation manual completely to ensure proper installation, then file it
Installation
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
Packing List
•
discarding any packaging material. If any parts are missing, do not begin installation
•
•
IS
T H
E
•
S ID
until you obtain the missing parts.
U P
The inspection and testing results of this equipment should be recorded weekly
to verify proper operation. This equipment should be inspected annually to ensure
compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per
ANSI Z358.1.
Fisher Safety
A Fisher Scientific Company
1-800-772-6733
For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 800.BRADLEY (800.272.3539).
Product warranties and service parts information may also be found under "Products"
on our web site at www.bradleycorp.com.
Disconnect before servicing. Inspect cord for fraying. Make sure there is no visible
damage to the yoke's electrical system
This unit is to be used with tepid, potable water as defined by ANSI Z358.1. (Note: avoid
100˚ F
prolonged exposure to ambient heat sources above 100° F, or below 60° F).
60˚ F
Supplies and Tools Required:
• Pipe sealant
• Air pressure equipment or supply (clean and free of oil and contaminants) capable of up to 100 psi.
• Sign-mounting hardware
• Philips-head screwdriver
• Adjustable wrench
2
WARNING
.
Bradley Corporation • 215-1416 Rev. P; ECN 12-05-001C
4/3/2012
Installation