Final Installation Check List - Samsung DV48J7700E Série Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

Final installation check list

• The dryer is plugged into an electrical outlet and grounded properly.
• The exhaust ductwork is hooked up and the joints are taped.
• You have used rigid or stiff-walled flexible metal duct material, not plastic flexible duct.
• The dryer is level and is sitting firmly on the floor.
• For gas models: The gas is turned on and there are no gas leaks.
• Start your dryer to confirm that it runs, heats, and shuts off.
28 English
DV7700J-03170Q-05_EN-US.indd 28
5. Attach the 'Y" connector to the brass
male end of the small hose.
Screw on the coupling by hand until it is
seated on the connector.
6. Using pliers, tighten the coupling with
an additional two-thirds turn.
NOTE
Do not overtighten, as it may damage the
coupling.
7. Attach the angled end of water hoses
(C) to the fill valve at the bottom of the
dryer rear frame. Screw on the coupling
by hand until it is seated on the fill valve
connector.
8. Using pliers, tighten the coupling with
an additional two-thirds turn.
NOTE
Do not overtighten, as it may damage the
coupling.
9. Turn the cold water faucet on.
10. Check for leaks around the "Y" connector,
faucets and hoses.
2015/11/3 11:28:07

Publicité

Table des Matières
loading

Table des Matières