Samsung DV48J7700E Série Mode D'emploi page 24

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
WARNING
For U.S. models: Risk of electrical shock
• All U.S.models are designed for a 3-WIRE SYSTEM CONNECTION. The dryer frame is
grounded to the neutral conductor at the terminal block. A 4-WIRE SYSTEM CONNECTION
is required for new or remodeled construction, mobile homes, or if local codes do not
permit grounding through neutral. If you use the 4-wire system, you cannot ground the
dryer frame to the neutral conductor at the terminal block.
• Remove the terminal block cover plate. Insert the power cord with a UL-listed strain relief
through the hole provided in the cabinet near the terminal block.
• A strain relief must be used. Do not loosen the nuts already installed on the terminal
block. Be sure they are tight. Use a 3/8" (1cm) deep well socket.
24 English
DV7700J-03170Q-05_EN-US.indd 24
9. To ensure that the dryer provides
optimal drying performance, it must
be level. To level the dryer, follow the
A
lettered steps below:
A. Using a leveller (A), check if the
B. If the dryer is not level, adjust the
B
dryer is level side to side and then
front to back.
leveling feet (B) on the bottom of the
dryer until the dryer is level side to
side and back to front.
Turning the feet clockwise retracts
the feet. Turning the feet clockwise
loosens and extends them.
2015/11/3 11:28:06

Publicité

Table des Matières
loading

Table des Matières