Power Requirements
Installation Procedure
1) Unpack Hood
2) Prepare ductwork
3) Prepare Wall
English 4
Electrical Specifications: 120V AC, 60Hz. 15A Branch Circuit
WARNING:
switch power off at the service panel and lock the panel to prevent the
power from being switched on accidentally.
Pull hood from outer packaging. Remove and discard all packaging materials.
Remove filter and set aside (See Use and Care manual for removal instructions).
Install one-way damper so that the flap opens up. Press damper down into the
blower outlet until it is snug. Note: verify that the flap opens up (toward the ceiling)
before continuing. See "Prepare Ductwork" on page 4. If necessary, install transi-
tion, thermal break and additional backdraft damper.
See "General Information" on page 2 for recommended installation height and
"Mounting Requirements" on page 3 for information on wall requirements.
Once the preferred height is determined, draw a line at the vertical centerline of
the cooking appliance.
Use the installation template to locate and mark the screw holes. Drill 1/4" (6 mm)
pilot holes (4 holes for hood screws and 2 holes for chimney screws). Install plugs
To avoid electrical shock hazard, before installing,
Figure 2: Prepare Ductwork