6.2
Connection plan
K1
L1
L2
L3
N
PE
8200 vector
9300 vector
9300 servo
4
Integrate the thermal contact into the monitoring system so that the mains supply is switched off when the filter is
overheated.
6.3
Connection data
Type
E82ZZ15334B230
E82ZN22334B230
E82ZN30334B230
E82ZN45334B230
E82ZN55334B230
E82ZN75334B230
E82ZN90334B230
Type
E82ZZ15334B230
E82ZN22334B230
E82ZN30334B230
E82ZN45334B230
E82ZN55334B230
E82ZN75334B230
E82ZN90334B230
EDK82ZN903 DE/EN/FR 5.1
L1
L2
L3
Load
PE
J >
"Line"
(Terminals L1/L2/L3)
Max. conductor
Tightening torque
cross−section
2
[mm
]
[AWG]
[Nm]
16
6
2 ... 4
35
2
2 ... 5
50
1/0
2 ... 6
95
4/0
6 ... 12
95
4/0
120
250
10 ... 20
Thermostat (terminals T1/T2)
Max. conductor
Tightening torque
cross−section
2
[mm
]
[AWG]
[Nm]
4
28 ... 10
0.6 ... 0.8
l
Electrical installation
Connection plan
4
F1...F3
T1
T2
L1
L2
L3
Line
PE
E82ZZ...
E82ZN...
(Lines with ring cable lug)
Æ
[lb−in]
17.7 ... 35.4
M6
17.7 ... 44.3
17.7 ... 53.1
M8
53.1 ... 106.2
M10
88.5 ... 177
PE (stud bolt)
Æ
[lb−in]
M6
5.3 ... 7.1
M8
M10
6
8200vec107
"Load"
Tightening torque
[Nm]
[lb−in]
See documentation on
basic device
Tightening torque
[Nm]
[lb−in]
5
44.3
12
106.2
23
203.6
37