Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

Due to the high power output of the PDR-V75
considerable heat is produced when the amplifier
und to
is in operation. For this reason, the amplifier should
ing
be mounted in a location which will allow for free
s in
circulation of air, such as inside the trunk. For
pment
alternate installation locations, please contact your
y, and it
authorized Alpine dealer.
ordance
1. Remove the hexagon screws using the supplied
Hexagon Wrench (small). (Fig. 1)
nit in
e is
Hexagon Screws
anty,
2. Slide the Top Cover, and lift it to remove. (Fig. 2)
• Be sure not to damage the indicator area.
which
d States
r dealer
ge.
..............4
......1 SET
..............1
3. Using the amplifier as a template, mark the four
screw locations.
4. Make sure there are no objects behind the
surface that may become damaged during
drilling.
5. Drill the screw holes.
6. Position the PDR-V75 over the screw holes, and
Holes
Fig. 1
NOTE:
• To securely connect the ground lead, use an
already installed screw on a metal part of the
Top Cover
vehicle (marked ( )) or a clean, bare metal spot
on the vehicle's chassis. Be sure this is a good
ground by checking continuity to the battery (–)
terminal. Connect all equipment to the same
ground point while keeping wire length as short
as possible. These procedures will help eliminate
noise.
Fig. 2
secure with four self-tapping screws. (Fig. 3)
Self-Tapping Screws (M4 × 20)
Ground Lead
Chassis
ALPINE PDR-V75 68-25285Z56-A (EN/FR/ES)
EN
FR
ES
Holes
Fig. 3
3
-EN

Publicité

Table des Matières
loading

Table des Matières