5.

Application

Ready-to-connect stainless steel fittings for wall mounting, for connection to hot and
cold water from right or left rear position using connection pipes. With pre-installed
fitting connection units.
6.

Scope of delivery

7.

Dimensions

8.

Installation example

9.

Assembly

Important!
Prior to the assembly process, flush the pipework in accordance with DIN 1988.
To protect the tiles, use masking tape when marking and drilling. Drill at low speed.
Depending on the composition of the wall, special wall plugs may have to be used
(to be provided by the customer).
9.1
The drill-holes for the suspension strip should be marked according to the dimen-
sions.
9.2
Drill holes in accordance with these markings.
9.3
Insert the wall plugs.
9.4
Screw on the suspension rail.
9.5
Place the upper pipe onto the suspension strip brackets.
9.6
Install the water supply at the designated points.
9.7
Check that the water connections do not leak.
9.8
Slide the housing over the pipe.
9.9
Insert the housing into the suspension rail.
9.10 Adjust the housing, using the tension bolts (a).
Do not fasten the tension bolts (a).
9.11 Mark the remaining drill holes.
9.12 Loosen the tension bolts (a).
9.13 Remove the housing.
9.14 Drill holes in accordance with these markings.
9.15 Insert the wall plugs.
9.16 Pull the protective film off from the housing.
5