structure B (Fig.4).
Adjust the height by referring to the
amounts indicated in (Fig.5) and block
it usingthe 8 screws G that are supplied
(Fig.6).
- Fix the flexible pipe to the prepared air
evacuation hole (Fig.7).
- Take the upper chimney piece and fix
it to the structure using the 2 screws A
(Fig.8). Join the lower chimney piece
with the upper one and fix it carefully
using adhesive tape L (Fig.9A).
- Unscrew the 2 screws O, max 3 mm
(Fig.9A). Insert the exhaust unit inside
X = C - (3-9/16"+A+25-9/16"+B)
Fig.5
Fig.4
25-9/16"
Fig.6
- 10 -
G
G
C
B
C
G
B