Télécharger Imprimer la page

Daikin Siesta ACQ 71 BV1 Manuel D'installation page 9

Masquer les pouces Voir aussi pour Siesta ACQ 71 BV1:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
Wires Installation
Figure 1 and Figure 2 shows the location of cover wire in Indoor unit.
Steps to install power supply wires and wires from outdoor unit.
1.
Remove wire cover by removing 2 screws as shown in Figure 3.
2.
Wires will go through the hole as shown in Figure 4 and 5 respectively without crossing the height of the hole.
3.
After that, wire cover will be assembled back to close the wire.
1 IM-5CKYER-0411(1)SIESTA-EN.ind7 7
1 IM-5CKYER-0411(1)SIESTA-EN.ind7 7
Figure 2
Figure 4
! CAUTION
Do not install the unit at altitude over 2000m for both indoor and outdoor.
Figure 1
1-7
Figure 3
Power supply
terminal block
Shape wires so
that the stop valve
cover fit securely.
1-3
B
A
A<B
Figure 5
12/14/12 10:15:31 AM
12/14/12 10:15:31 AM

Publicité

loading

Ce manuel est également adapté pour:

Siesta acq 100 bv1Siesta acq 125 bv1