Télécharger Imprimer la page

poolstar Gaia Bella Manuel D'installation page 22

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
20
3
Storage side panel
21
1
Storage top panel
22
1
Storage bottom panel
23
1
Wire cover (sauna stove)
24
1
Interior floor panel
25
1
entrance step
26
2
Door handle
27
1
Wire cover
28
1
Control box
29
60
Rain coat (gray)
30
2
Asphalt shingle (grey)
31
1
Water nose
32
1
Top filling slat (13mm)
33
1
Top filling slat (16mm)
34
1
Top filling slat (34mm)
Read the assembly instructions carefully before starting.
Choice of location
Holl's saunas are designed solely for exterior installation.
Select a space:
In a dry area, on a flat stable surface that can support the weight of your sauna.
The height must be sufficient for you to reach the ceiling and carry out electrical connections and maintenance.
Away from any source of water, flames or flammable materials.
Practical advice
Note that sauna assembly requires 3 adults.
Clearly identify each panel before you begin
During assembly, position your sauna's mains cable so that it is easily accessible.
Note that there are variations between the models.
IMPORTANT:
Please check the countersink and hole diameter of the drill holes to avoird damaging the wood.
The minimum room height required for installation is 2020 mm.
Tools needed
20
Installation
Screwdriver
Pencil
2 Spanner
(19 mm)
Wood spiral drill
Included accessories:
Tape measure
Cutter
Electric
screwdriver
Allen Wrench
Step ladder
Mallet

Publicité

loading