Télécharger Imprimer la page

burgbad Diva M1023 Instructions De Montage page 20

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 22
BATHTUB DIVA / INSTALLATION
1. Please extract the push rods to separate the levelling frame from the bathtub frame.
2. Place the levelling frame to the provided place of installation of the tub on the fl oor. The recess in
the levelling frame points to the tap support of the bathtub. Level the frame horizontally at the
height-adjustable feet by means of a water level and tighten it securely with screws.
3. Install pop-up and overfl ow set to the bathtub.
4. Place the bathtub over the levelling frame.
5. Connect the levelling frame to the bathtub by means of the push rods
6. Install water and waste water connections.
Installation of the panel (tap, waste)
Place the panel below the tap support and adjust it with the height-adjustable feet, if applicable.
Silicone
We recommend sealing the joints around the foot of the tub and around the panel with silicone.
Height-adjustable feet of the panel
40
Panel completely mounted

Publicité

loading