Bathtub Apron; Diagram - HOESCH Whirlsystem Deluxe Instructions De Montage Et D'utilisation

Baignoire balnéo
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 39
04

Bathtub apron

After a test run fi nish encasing the bathtub. Between the bathtub edge and the casing allow for a gap of 3-4 mm
wide for silicon seal (consider the producer's tips regarding the usage of the product!). While encasing the bathtub
it is necessary to consider the following points:
1.
All systems of conduits and components of the system initially installed in the bathtub and the ones installed
at the factory must rest freely behind the walling.
2.
The displayed system components, fi rst of all the fan side of the pump, should be protected against dirt
by covering them.
3.
Mount the apron in such a way that the system components are protected against touching and water splashing.
The bathtub's operation without the apron is not allowed, except for the test run.
4.
In case of all models, place easily accessible and easily opening inspection windows
min. 400 to 450 mm wide and 350 mm high, according to annexed drawings with dimensions.
A maintenance opening at least 300 mm wide and 300 mm high must be provided in the vicinity of the
solenoid valve combination.
Moreover, allow for an inspection window near the outlet.
The inspection window can be opened only with the use of proper tools. The given dimensions should be
absolutely maintained, because in case of a need for maintenance only then it is possible to easily disassemble
the system components. An ideal solution is placing the „air and inspection grate" produced by HOESCH,
dimensions 420 x 325 mm (article No. 6683.---).
5.
On account of the rotating jets and the blower a free inlet of air should be provided (approx. Vo = 60,0 m³/h with
the max. number of revolutions of the blower), because when the casing is hermetically tight there is no inlet
of air to the rotating jets and to the blower. A hole with the dimensions 100 x 100 mm in the casing is suffi cient.
The use of the „air and inspection grate" will provide suffi cient infl ow of air.
05

Diagram

1 1/2" closing valve purchased separately
2 Pipe interrupter A2 shape DIN 1988
(additional accesories)
3 Control panel
4 Infrared receiver / disinfection tank
5 Pilot
6 Controller
7 Pump
8 The steering connection to the mains 230V~,
50/60 Hz, 10 A connection box self- provided
9 Blower
10 Electromagnetic valves combination
11 Sewerage system terminal Ø 40/50
12 Bottom nozzle
13 RGB-LED
14 Hydromassage jet
15 Inspection opening
1
2
9
10
15
13
3
4
5
11
12
13
14
15
15
GB
6
7
8
31

Publicité

Table des Matières
loading

Table des Matières