Télécharger Imprimer la page

VBM DOMOBAR JUNIOR HX Manuel D'instruction page 51

Publicité

Les langues disponibles
  • FR

Les langues disponibles

7.2,
FIRST START.
· Load water as described in paragraph "Water load".
· Place the mains switch (1) to "ON", the line lamp (2) will
light and the pump automatically starts to fill the boiler,
when you hear a beep sound, turn off the machine with
the switch ( 1) and turn it on again.
· Do this a few times until the complete filling of the
cylinder indicated by the lighting of the lamp (3).
· Raise the lever (4) and hold it up until the water overflows
from the group (5), indicating that the heat exchanger is
filled with water, and then lower the lever (4).
· Turn off the machine by placing on "OFF" the main
switch (1).
7.3,
START.
· Place the line switch (1) to "ON", it will light the lamp of line (2) and starts the water heater,
shown by the lighting of the lamp (3).
· Wait until the boiler reaches the water temperature indicated by the turning off of the lamp
(3) at this point the machine is ready for use.
3
2
5
4
1
on
off
17

Publicité

loading

Ce manuel est également adapté pour:

Ac0820cm