HOESCH CIELA Instructions De Montage Et D'utilisation page 5

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 7
Contents
01
General information ................................................................................................................................................5
02
Setting up room for shower tray and shower enclosure..........................................................................................5
03
Caring for the steam bath/shower cabin .................................................................................................................6
03.01
Caring for the glass panes and profi les ..................................................................................................................6
03.02
Caring for the fi ttings ...............................................................................................................................................6
03.03
Do not use ... ..........................................................................................................................................................6
04
Scope of delivery ................................................................................................................................................. 21
05
Planning instruction.............................................................................................................................................. 22
06
Installation ........................................................................................................................................................... 26
01
General information
Hoesch products set the benchmark for quality, comfort and design. To assure optimal function and a long life cycle
of your product please comply with the following instructions. Each delivery is strictly controlled before leaving
the factory. Check the completeness of the delivery before starting installation. Products represented here are subject
to technical and visual modifi cations! All dimensions data is in mm. All connection measures are internal measurements!
We are not liable for defects resulting from non-conventional usage, improper transport or faulty intermediate storage.
Our respectively valid warranty conditions are in force.
During mounting protect the surface of shower tray with cover!
Do not put glass panes on rims or corners!
Caution! Check the delivery for transport damage! Later claims will not be accepted!
The choice of raw plug and screws depends upon the wall's material!
Water connections
At installation to potable water supply plumbers or users must connect fi rst a safety device complying with
national requirements.
Wall joints must be sealed with non-hardening joint sealing. The device mus be fl ushed with water according to
DIN 1988. For domestic installation a dirt trap shall be provided by the user.
02
Setting up room for shower tray and shower enclosure
Ciela shower tray can be installed in the corner, to the wall or in a niche
All sanitary-water connections should be executed according to point 05.
The drain outfl ow must be placed in a propoer specifi ed area.
While fi tting the shower tray and shower enclosure on the existing base, attention should be paid to the ceiling
height (special accessories, base frame).
At shower enclosure installation a distance of min. 100 mm above the shower enclosure to the ceiling must be
assured.
The riser shaft depth of 150 mm should be considered during shower tray installation on the fl oor.
The shower Ciela enclosure has been designed for installation on bricked walls. Please strenghten other wall
structures (wood, gypsum board), to ensure a reliable fastening.
Please note that in the shower enclosure area only appropriate materials for wall covering must be used. A
ground surface treatment according to moisture stress class FKB 2 is required.
Before installation the walls must be completely tiled at the entire cabin hight.
The ground surface at the installation location must be perfectly fl at.
A ventilation as well as suffi cient air dehumidifi cation in the installation room are to be ensured. If necessary,
please apply a suitable ventilation appliance for water vapour dissipation in a controllable manner (DIN 18017,
DIN 1946 etc.).
Silicone must be provided by building constructor. Please keep in mind that maintenance joints may
require cleaning.
GB
5

Publicité

Table des Matières
loading

Table des Matières