Télécharger Imprimer la page

Pattfield Ergo Tools PE-TP 1000 N Traduction De La Notice Originale page 72

Masquer les pouces Voir aussi pour PE-TP 1000 N:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 13
5. Before starting the equipment
Before you connect the equipment to the mains
supply make sure that the data on the rating plate
are identical to the mains data.
5.1 Installation
The equipment can be installed either:
Stationary with a rigid pipe line
or
Stationary with a flexible hose line
Connect the pressure hose or pipe to the
pressure connector (1) using a suitable con-
nector.
Fasten the securing cable (4) to the suspensi-
on eyelet (Fig. 1/Item 2).
Notice!
Before you use the pump, clarify any possible
special conditions which need to be fulfi lled for
the installation!
For example, additional safety measures may be
needed if damage to property could result from a
power failure, soiling or a defective gasket.
Examples of such safety measures:
Pumps running in parallel on a separately protec-
ted power circuit, moisture sensors for switching
off the pumps, and similar safety arrangements.
Be sure to consult a professional plumber if you
have any doubt.
If you use rigid pipe lines, we recommend that
you use cable ties to bind the power cable to the
discharge line, with a spacing of approx. 3 m.
Install the pump in such a way that the underside
is at least 20 cm above the bottom, in order to
prevent sand, sludge, etc., being drawn into the
pump.
When installing, never hang the equipment by the
discharge line or by the power cable. The device
must be hung up by the provided suspension
eyelets.
The pump shaft should be large enough.
5.2 Mains connection
Danger!
The equipment you have purchased comes with
an earthing-pin plug. The equipment is designed
for connection to a socket outlet with earthing
contact for 220-240 V~ 50 Hz. Make sure that the
socket-outlet is suffi ciently fused (at least 6 A)
and in good working order. Insert the power plug
Anl_PE_TP_1000_N_SPK7.indb 72
Anl_PE_TP_1000_N_SPK7.indb 72
GB
in the socket-outlet and the equipment is ready
for operation.
Danger!
To rule out danger, this work must be left strictly to
a specialist electrician or Customer Service.
6. Operation
You can put the equipment into operation after
you have thoroughly read the installation and ope-
rating instructions. Pay attention to the following
points:
Check that the discharge line is fitted correct-
ly.
Make sure that the electrical connection is
220-240 V~ 50 Hz.
Check that the electrical socket-outlet is in
good working order.
Make sure that no moisture or water can ever
reach the power connection.
Lower the pump into the well or shaft using
the securing cable.
Ensure that the pump is completely under the
surface of the water and approx. 20 cm above
the bottom.
Make sure that the equipment does not run
dry.
To switch off the equipment, pull the power
plug out of the socket outlet.
7. Replacing the power cable
Danger!
If the power cable for this equipment is damaged,
it must be replaced by the manufacturer or its
after-sales service or similarly trained personnel
to avoid danger.
- 72 -
27.11.2017 10:48:50
27.11.2017 10:48:50

Publicité

loading