40" ELECTRIC RANGE INSTALLATION INSTRUCTIONS
5.2
Drill Pilot Holes and Fasten Bracket
Drill a 1/8" pilot hole where screws are to be located.
If bracket is to be mounted to the wall, drill pilot hole at
an approximate 20° downward angle. If bracket is to
be mounted to masonry or ceramic floors, drill a 3/16"
(4.8 mm) pilot hole 1-3/4" deep.
Figure 9: Drill pilot holes
The screws provided may be used in wood or concrete
material. Use a 5/16" nut-driver or flat head screwdriver to
secure the bracket in place.
Leveling Leg
1/8" Minimum
Floor Mount
Figure 10: Fastening the bracket
Anti-Tip Bracket
Wall Mount
Wall Plate
5.3
Check Level and Position the Range
Check the level of the final installation. Note: A minimum
clearance of 1/8" is required between the bottom of the
range and the leveling leg to allow room for the bracket.
Use a spirit level to check your adjustments.
Figure 11: Leveling the range
Slide range into position.
3 5/16"
(84mm)
Figure 11: Slide appliance into bracket
To check if the anti-tip bracket is installed properly,
use both arms and grasp the rear edge of range back.
Carefully attempt to tilt range forward. When properly
installed, the range should not tilt forward.
If range is moved to a different location, the anti-tip
brackets must also be moved and installed with the range.
10