Blatchford Elite Blade EB22L1S Instructions D'utilisation page 7

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 15
7 Cutting Shin to Length
Use appropriate health and safety equipment at all times including
extraction facilities.
Be aware of finger trap hazard at all times.
Note... The following instructions assume the use of the male, sliding, rotating pyramid. If an
alternative adapter is required, this should be taken into account throughout the build
process.
1.
Cut the blade 10–15 mm longer than required
and assemble fitting clamp (941255).
3.
Tighten fitting clamp bolts to 15 Nm
(check each screw at least twice).
5
5
15 Nm
7
2.
Fit socket to fitting clamp top housing and
tighten pyramid screws (15 Nm). Refer to
alignment page for initial setup.
4.
Stand user, carry out dynamic alignment and
walking trials. Adjust height to achieve definitive
length with weight evenly distributed.
4
15 Nm
938295S/2-0120

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Elite blade eb30r9sElite blade eb22l1sdElite blade eb30r9sd

Table des Matières