First Aid Checklist
for electromotive tables
CHECK THE PLUG CONNECTIONS IN THE CONTROL UNIT
(IN THE HORIZONTAL CABLE CHANNEL ON THE DESKTOP'S UNDERSIDE)
Is the appliance connected to the power outlet?
Is there power to the socket?
Is the power supply lead (3-pole) properly inserted into the control unit (power port
PWR)?
Are the corresponding plugs connected to actuator ports M1 and M2 in the control
unit? Check if the connections are secure.
Is the manual switch plugged in to the designated port, HS, on the control unit?
CHECK THE FUNCTION OF THE SWITCH
A) SWITCH WITHOUT DISPLAY
Is the pressure-point from press and release visible?
B) SWITCH WITH DISPLAY
Does the display shine?
Does the display change, when pressing a key?
DESK STABILITY
Are the levelling feet (2 on each leg) evenly in contact with the ground?
Paper test: Put a piece of paper underneath all 2 height adjusters of the table foot.
It should be possible to pull out the paper with equal force.
22
checked
POTENTIAL MALFUNCTION AND THE RECTIFICATION
Potential cause
MOTORS ONLY MOVE IN ONE DIRECTION
Power failure during move
TABLE OVERHEATED (FOR MEMORY FUNCTION – THE DISPLAY SHOWS HOT)
The overheating protection was
activated due to overheating
If you encounter any malfunctions that cannot be remedied with the measures listed above or if the
same faults keep reoccurring, please fill in the first-aid checklist and send it to our Customer Service
department at service@ophelis.de. We will get in touch with you as soon as possible.
The following information you will find on the lable below the table top:
Order confirmation number:
Item:
Article number:
Description of the malfunction:
Date, Signature
You can find the checklist as well as download on our homepage under the category of the
tables CL Series.
ophelis Technical documentation and operating instructions for CL Series sitting-standing workplaces
Error handling
Carry out a manual reset
Wait 18 minutes for the motor control unit to cool
off or for HOT to disappear from the Display; the
desk will then be ready for operation again
checked
23