INITIAL OPERATION

5.1 SUSPENDING THE TOOL

The tool is equipped with a universal suspension bow
1
(3/1). It can be suspended on a spring balancer. The
suspension bow is designed to strap the package
horizontal, vertical or side ways.

5.2 COMPRESSED-AIR CONNECTION

Motor and sealing piston are lubricated by oil mist of
the compressed air. Properly prepared compressed
air is therefore essential for trouble-free operation of
the tool. This can only be ensured by a reliably func-
tioning maintenance unit, consisting of water separa-
tor, pressure reducing valve with pressure gauge and
oil mist lubricator.
The oil mist lubricator should supply sufficient oil.
The length of the hose between the STR 66 and the
maintenance unit should not exceed 5 m (15 ft). The
internal diameter of the pipe should be at least 10 mm
(
/
"). It must be ensured that the hose does not form
3
8
loops, where oil can collect.