Costs setup

This area is reserved to Administrator.
This section allows to carry out the settings for energy costs calculation.
Currency
Currency used for the energy costs (it can be typed max 7 characters; e.g. to set Euro currency, type EUR,
euro or €).
+kWh TOT, ...
Unit cost for each energy counter (total, tariff1, tariff2; available for active and apparent energy only). Values
range: 0.0001 ... 99999.9999.
To restore factory settings for energy costs calculation, press Default key. A warning message will be shown, press OK to restore.